top of page
image003 (1)_edited_edited.jpg

Anfield Stadium Development
Washington, DC

Project Overview

RSF: 15,000
Project Type: Base Building Development

Project Team

Developer: Anfield Stadium, LLC Architect: Collective
Construction: Winmar Construction MEP Engineer: Century Engineering Structural Engineer: MGV Engineering Civil Engineer: Bohler

Project Features

  • Vertical and Horizontal Green roofing Systems to meet GAR requirements.

  • Orange Barrel Media digital display.

  • Flexibly designed for up to 4 retail tenants.

Highlighted Services

  • Development management.

  • Worked with zoning attorneys and dry utility expeditors.

  • Coordinated with DCRA, DOEE, DDOT, ANC, HPRB, and all utilities.

Successful Results

  • Accelerated schedule.

  • LEED Certification.

  • Green roofing system.

  • Created and guided client through multiple tenant work letters.

  • Created flexible space meeting all tenant requirements.

​​

  • Maintained budget and schedule throughout global pandemic and local unrest.

1299 Takoda_edited.jpg

Atlas Real Estate Management & Consulting

1201 Connecticut Ave NW, Ste 610, Washington, DC 20036

info@atlasremgt.com | 202-735-0708

© 2013-2025 Atlas Real Estate Management & Consulting - All Rights Reserved.

bottom of page